Skok na obsah
§ Najdi.revizi CS
Issue 2026
Issue theme

Almanach mandatory inspections

Chimneys. Fire extinguishers. Air conditioning. Gas. Electrical systems. Lightning conductors. Pressure vessels. Lifts. One form: all sectors.

Inspectors in high-visibility vests check industrial equipment.
Foto · 2026
Without the inspection engineer's stamp, fire insurance will not be paid out.
8
Fields of mandatory inspections
47 000
SVJs in the Czech Republic according to ČSÚ
1,5 M
Kč penalty for non-performance (max.)
24 h
Response with quotes
Kapitola II
II.

Register of sectors subject to mandatory inspections

Eight sectors where the law, decree or standard require regular inspection. Click on the sector for details, deadlines and to request an engineer.

    01
    Inspection chimneys
    § 43, NV 34/2016 Sb.

    Without the chimney sweep’s stamp, the insurance company will not cover the damage. And fire inspections are an annual necessity for boilers burning solid fuels.

    Deadline
    1× / rok
    →
    02
    Inspection fire extinguishers
    § 9, vyhl. 246/2001 Sb.

    A non-functional fire extinguisher in the event of a fire = criminal liability. Inspection is not a formality; it saves property and lives.

    Deadline
    1× / rok
    →
    03
    Inspection air conditioning
    EU Regulation 517/2014 (F-gases)

    Refrigerant leak = fine up to 1.5 million Kč. F-gases have a global warming potential thousands of times higher than CO₂.

    Deadline
    1× / rok
    →
    04
    Inspection plyn
    Decree No. 85/1978 Coll. + ČSN EN 1775

    A gas leak kills faster than a fire. Regular inspection is an enforceable obligation for the building’s owners’ association manager.

    Deadline
    1× / 3 roky
    →
    05
    Inspection elektro
    CSN 33 1500, CSN 33 2000-6

    Without a valid initial inspection, there is no occupancy permit. Without a periodic inspection, the insurance company will not cover fire damage.

    Deadline
    1× / 5 let
    →
    06
    Inspection hromosvody
    CSN EN 62305

    Statistically, lightning strikes one in ten buildings over four storeys high. Without a functioning LPS, the insurance company automatically reduces the payout.

    Deadline
    1× / 4 roky
    →
    07
    Inspection pressure vessels
    vyhl. 18/1979 Sb.

    A pressure vessel without a valid inspection = immediate shutdown of operations by the Labour Inspectorate.

    Deadline
    1× / 5 let
    →
    08
    Inspection elevators
    CSN 27 4002

    An elevator is a designated lifting device, without an inspection logbook, the building’s owners’ association risks penalties from the Labour Inspectorate.

    Deadline
    1× / 3 months
    →
Editorial

Six principles that facilitate orientation

The rules by which we write this almanac. No paid placements, no lengthy forms, no marketing fluff. Everything based on laws and practice.

  1. 01
    Precision

    Current legislation

    All content is based on the laws and regulations of 2026. We monitor amendments and update immediately.

  2. 02
    Srozumitelnost

    Without legal jargon

    We explain complex topics in plain English with practical examples. Goal: a layperson will understand it.

  3. 03
    Orientace

    Simple search

    Seven types of inspections, covering every detail, with price lists and downloadable resources. Search by fuel type, equipment type, or region.

  4. 04
    Prices

    Estimates

    Average prices by type and region, so you know what to budget for. No deceptive “from 1 Kč” offers.

  5. 05
    Soupisy

    List of technicians

    Links to databases of certified inspection technicians in your region. Our own lead form as an alternative.

  6. 06
    Bezplatnost

    No hidden fees

    Content completely free, no registration required, no email needed to read. Information for everyone.

Kapitola III
III.

How Najdi revizi funguje

Three steps from form to the stamp in the inspection logbook. No need to call ten companies, no uncertainty about who is authorised.

  1. Krok 01
    Send your request

    Select your trade, enter your region or postcode and a brief note. 90 seconds, no registration required.

    §F1 / 2026
  2. Krok 02
    We match technicians

    We will find 2-3 verified technicians with valid certification and active practice in your region.

    §Match · 24 h
  3. Krok 03
    You will select and sign

    You will receive an email with offers and contacts. You choose. We do not stand in the middle anywhere.

    §Stamp · Done
Kapitola IV
IV.

Calendar of Obligations

Table of statutory deadlines. Print and display in the boiler room or in the building's owners' association technical documentation.

1× / rok
§ 43, NV 34/2016 Sb.

Inspection chimneys

Annual inspection, inspection at commissioning and after intervention.

1× / rok
§ 9, vyhl. 246/2001 Sb.

Inspection fire extinguishers

Annual operational check and periodic test according to the type of appliance.

1× / rok
EU Regulation 517/2014 (F-gases)

Inspection air conditioning

Annual leak tightness check, deadline according to refrigerant content in tCO₂eq.

1× / 3 roky
Decree No. 85/1978 Coll. + ČSN EN 1775

Inspection plyn

Operational inspection once every 3 years, annual check, initial upon commissioning.

1× / 5 let
CSN 33 1500, CSN 33 2000-6

Inspection elektro

For flats and offices 5 years, for wet/dusty areas 1-3 years.

1× / 4 roky
CSN EN 62305

Inspection hromosvody

Class LPS I+II every 2 years, Class III+IV every 4 years.

1× / 5 let
vyhl. 18/1979 Sb.

Inspection pressure vessels

Internal inspection every 5 years, pressure test every 9 years.

1× / 3 months
CSN 27 4002

Inspection elevators

Service inspection 4×/year, expert inspection 1×/year, inspection report every 6 years.

A residential building in Prague with a historic façade
For owners' associations · 47 000 in the Czech Republic
Kapitola V

For owners' associations and apartment buildings

PThe chairman of the building's owners' association is responsible for ensuring that all Mandatory inspections are due on schedule. Lightning protection, gas, lift, fire extinguishers, and electrical systems in common areas, without the official stamp, the insurance company will not cover damage from fire, gas explosion or lightning strike.

We will arrange the package 5 inspections in one appointment. Technicians will meet on a single day and issue reports with a unified archive folder for collection.

Kapitola VI
VI.

Current legislation

Overview of key laws, decrees and standards governing mandatory inspections in the Czech Republic. We track amendments up to the date of publication.

  1. NV 34/2016 Sb.
    Decree on the cleaning, inspection and review of flue gas ducts
    Chimneys · fireplaces · boilers
  2. Vyhl. 246/2001 Sb.
    Setting conditions for fire safety and performance of state fire supervision
    Fire extinguishers · PHP
  3. Act 133/1985 Coll.
    On fire protection (in its current version)
    Fire extinguishers · records
  4. EU Regulation 517/2014
    On fluorinated greenhouse gases (F-gases)
    Air conditioning · refrigerants
  5. Decree No. 85/1978 Coll.
    On inspections, statutory checks and testing of gas installations
    Gas · boilers · connections
  6. CSN 33 1500
    Electrical regulations. Inspection of electrical equipment.
    Electrical · common areas
  7. CSN EN 62305
    Lightning protection system (LPS)
    Hromosvody · LPS
  8. Vyhl. 18/1979 Sb.
    Safety of designated pressure equipment
    Pressure vessels · boiler rooms

Status as of 2 May 2026 · We monitor amendments via the SAGIT system and the Collection of Laws.

Form F1 / 2026

Request for an inspection technician

Fill in the form and within 24 hours we will send you offers from 2-3 verified technicians from your region. Free of charge, no obligation.

  • § Free of charge. You do not pay for the intermediary service.
  • § Only verified technicians with a valid certificate.
  • § Response with quotes within 24 hours on working days.
Request · F1 · 2026
No obligation · response within 24 h